Skip to main content

Table 3 PCR1 and PCR2 program specifications

From: Validating a multi-locus metabarcoding approach for characterizing mixed-pollen samples

Program

Step

Temperature ( °C)

Time

Number of cycles

1

Initial denaturation

94

10 min

 

Denaturation

94

30 s

40×

 

Primer annealing

54

40 s

 

Extension

72

1 min

 

Final extension

72

10 min

2

Initial denaturation

94

10 min

 

Denaturation

94

30 s

40×

 

Primer annealing

56

40 s

 

Extension

72

1 min

 

Final extension

72

10 min

  1. Bolded values are changes in annealing temperature between programs. PCR3 followed the program specifications indicated above, with an annealing temperature of 60 °C