Skip to main content

Table 4 The time consumption of manual and TLS methods

From: An automatic method for counting wheat tiller number in the field with terrestrial LiDAR

Method Time (36 plots) Total time (36 plots)
Manual 6 h/person 6 h/person
TLS
Scanning 1.6 h 2.6 h
 Preprocessing 0.7 h
 Calculation 0.3 h